MIL-DTL-19834C
(f) Packaging requirements (see 5.1).
6.3 First article. When a first article is required, it should be inspected and approved under the appropriate
provisions of FAR 52.209. The first article should be a production sample. The contracting officer should specify
the appropriate type of first article and the number of units to be furnished. The contracting officer should include
specific instructions in all acquisition instruments regarding arrangements for selection, inspection, and approval of
the first article.
6.4 Subject term (key word) listing.
Adhesive film
Aluminum foil, type I
Aluminum foil, type II
Pressure sensitive foil
6.5 Changes from previous issue. Marginal notations are not used in this revision to identify changes with
respect to the previous issue due to the extent of the changes.
Custodians:
Army AR
Preparing activity:
Navy AS
DLA IS
Air Force 99
(Project 9905-2006-002)
Review activities:
Army CR, EA, GL, MI
Navy MC, OS, SA, SH
Air Force 11
NOTE: The activities listed above were interested in this document as of the date of this document. Since
organizations and responsibilities can change, you should verify the currency of the information above
using the ASSIST Online database at https://assist.daps.dla.mil/.
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business